- Get the Integra wiring harness installed and test the engine.
- Bleed and test the brakes.
- Build a battery box in the back of the car.
- Build a bracket for the hydraulic clutch master cylinder.
- Plumb the hydraulic clutch.
- Find some stiffer springs.
- Finish cutting out the extra weight in the car.
- Get a better seat.
Monday, August 17, 2009
Time is running out.
Less than a month to go. We've still got a lot to do, but there's light at the end of the tunnel. The current task list:
Subscribe to:
Post Comments (Atom)
No comments:
Post a Comment